A few weeks ago while driving the Jeep, the power steering lines completely rusted through and drained the lines in a parking lot. Without easy steering, I parked the Jeep for a few weeks until I could get the parts and a nice enough day to do the repair.
Figuring out a way to get the power steering lines out prooved to be a little more work than you would anticipate for a Jeep having the steering box OUTSIDE of the front bumper. I ended up having to completely remove the front grill and core frame in order to gain access to the lines. It may have only been 12 bolts, and removing the radiator but it brought along its own headaches.
Here is what the Jeep looks like without its front end:
Kinda cool. I’ve never had a vehicle with a main frame so you could just remove a large chunk of the front end. If the Jeep weren’t so rusty, working on this thing would be a snap.
The bad news though was that the radiator was on its last legs. The fins were all rotted away. I was surprised it worked at all… not something I was willing to test with Winter approaching.
A new radiator was ordered along with all new hoses and bolts. But that wasn’t the least of the troubles. The main body mount for the front had completely rusted through the frame. A quick patch panel was made and welded up. Looks pretty nice?
Gotta try and get it all back together tomorrow morning as long as the 40 degree day isn’t bombarded with snow or rain showers!